P1000064
Load of cypress picked up for the pergola.
Date: 09/28/2009
Views: 277
|
P1000067
I'll have to borrow a longer truck next time...
Date: 09/28/2009
Views: 33
|
P1000068
Rain-soaked lumber stacked with spacers to start drying.
Date: 09/28/2009
Views: 35
|
|
P1000072
Making a cover with the plastic sheeting in the forground.
Date: 09/28/2009
Views: 39
|
P1000075
Creating the templates for the decorative end cuts.
Date: 09/29/2009
Views: 44
|
P1000077
Templates for end cuts.
Date: 09/30/2009
Views: 55
|
|
P1000078
Loading tools to head up to Alex and Cheri' place.
Date: 09/30/2009
Views: 44
|
P1000082
Cover is off and the cypress is so much lighter when it hasn't sat in the rain for days.
Date: 09/30/2009
Views: 36
|
P1000083
Date: 09/30/2009
Views: 35
|
|
P1000085
Date: 09/30/2009
Views: 36
|
P1000086
Date: 09/30/2009
Views: 36
|
P1000087
Deconstructing the old pergola.
Date: 09/30/2009
Views: 43
|
|
P1000088
tabula rasa, ergo structas (never took Latin, so please feel free to correct my attempt)
Date: 09/30/2009
Views: 42
|
P1000089
Date: 09/30/2009
Views: 42
|
P1000090
Date: 09/30/2009
Views: 42
|
|
P1000092
Dave digging a hole for the foundation.
Date: 09/30/2009
Views: 40
|
P1000093
Jeff drills through the patio for one of the footers.
Date: 09/30/2009
Views: 42
|
P1000094
Date: 09/30/2009
Views: 41
|
|
P1000095
32" is code, so let's go down at least 34" ...
Date: 09/30/2009
Views: 41
|
P1000097
Setting solid block before post and concrete go in...
Date: 09/30/2009
Views: 40
|
P1000098
Date: 09/30/2009
Views: 42
|
|
P1000100
Date: 09/30/2009
Views: 42
|
P1000101
Posts are up; now to wait for concrete to set up...
Date: 09/30/2009
Views: 42
|
P1000102
Break time!
Date: 09/30/2009
Views: 42
|
|
P1000103
Template stenciled onto the lumber, then cut to create the decorations.
Date: 10/01/2009
Views: 43
|
P1000105
Date: 10/01/2009
Views: 41
|
P1000106
Date: 10/01/2009
Views: 38
|
|
P1000107
Dado cuts routed into the 2" x 10" beams (lintels) to accept the 2" x 8" rafters.
Date: 10/01/2009
Views: 40
|
P1000108
Date: 10/01/2009
Views: 43
|
P1000109
Date: 10/01/2009
Views: 38
|
|
P1000110
Date: 10/01/2009
Views: 39
|
P1000111
Date: 10/01/2009
Views: 37
|
P1000113
Date: 10/01/2009
Views: 37
|
|
P1000114
Date: 10/01/2009
Views: 39
|
P1000115
Date: 10/01/2009
Views: 39
|
P1000116
Date: 10/01/2009
Views: 37
|
|
P1000117
Posts 'relieved' (notches cut into sides) to accept the beams.
Date: 10/01/2009
Views: 38
|
P1000119
Date: 10/01/2009
Views: 36
|
P1000120
Rafters being installed atop the beams.
Date: 10/01/2009
Views: 39
|
|
P1000121
Date: 10/01/2009
Views: 36
|
P1000122
Date: 10/01/2009
Views: 36
|
P1000123
Date: 10/01/2009
Views: 38
|
|
P1000124
Date: 10/01/2009
Views: 35
|
P1000125
Rafters all in place with room left to clean out the gutters.
Date: 10/01/2009
Views: 37
|
P1000126
Date: 10/01/2009
Views: 36
|
|
P1000127
Date: 10/01/2009
Views: 39
|
P1000128
Date: 10/01/2009
Views: 40
|
P1000129
Starting to install the purlins atop the rafters.
Date: 10/01/2009
Views: 41
|
|
P1000130
Date: 10/01/2009
Views: 38
|
P1000131
Date: 10/01/2009
Views: 39
|
P1000132
Date: 10/01/2009
Views: 39
|
|
P1000133
Date: 10/01/2009
Views: 37
|
P1000134
Date: 10/01/2009
Views: 38
|
P1000135
Date: 10/01/2009
Views: 41
|
|
P1000136
Date: 10/01/2009
Views: 39
|
P1000137
Date: 10/01/2009
Views: 38
|
P1000138
Date: 10/01/2009
Views: 37
|
|
P1000139
Date: 10/01/2009
Views: 39
|
P1000140
Purlins all in place and "lookin' purdy"...
Date: 10/01/2009
Views: 39
|
P1000141
Upper structure completed; now to cover treated posts with a 1" thick skin of cypress.
Date: 10/01/2009
Views: 43
|